Artificial shortage in agricultural supply chains |
Ah:240 |
OR/MS / 64 / 3-4 / 199 |
Smart charging of electric vehicles: An innovative business model for utility firms |
Cd:240 |
OR/MS / 64 / 3-4 / 217 |
Coping with spatial mismatch: Subsidy design for electric vehicle and charging markets |
Cg:240 |
OR/MS / 64 / 3-4 / 227 |
Net-metered distributed renewable energy: A peril for utilities? |
Eb:240 |
OR/MS / 63 / 5-6 / 411 |
Unwatched pollution: The effect of intermittent monitoring on air quality |
Eg:240 |
OR/MS / 63 / 3-4 / 245 |
Environmental incidents and the market value of firms: An empirical investigation in the Chinese context |
Aa:240 |
OR/MS / 60 / 3-4 / 171 |
Forest harvest scheduling and endogenous road costs |
Cc:240 |
OR/MS / 59 / 5-6 / 403 |
Extremes on river networks |
Ez:240 |
OR/MS / 57 / 3 / 245 |
Long term production planning of open pit mines
by ant colony optimization |
Cd:240 |
OR/MS / 56 / 4 / 355 |
Can hazardous waste supply chain ‘hotspots’ be identified
using an input-output framework? |
Dz:240 |
OR/MS / 56 / 1-2 / 97 |
Environmental implications for online retailing |
Fc:240 |
OR/MS / 56 / 1-2 / 147 |
Socio-cultural acceptance of appropriate technology:
Identifying and prioritizing barriers for widespread use of urine
diversion toilets in rural Muslim communities of Bangladesh |
Bc:240 |
OR/MS / 55 / 5-6 / 463 |
Environmental taxes and the choice of green technology |
Ae:240 |
OR/MS / 55 / 1-2 / 21 |
Constructing a climate change logic: An institutional perspective on the “tragedy of the commons” |
Bz:240 |
OR/MS / 54 / 5-6 / 469 |
Modeling and forecasting daily electricity load curves: A hybrid approach |
Eb:240 |
OR/MS / 54 / 5-6 / 523 |
Dealing with the uncertainties of climate engineering: Warnings from a psychological complex problem solving perspective |
Ef:240 |
OR/MS / 54 / 4 / 377 |
Operational compliance levers, environmental performance,
and firm performance under cap and trade regulation |
Af:240 |
OR/MS / 53 / 4 / 315 |
Optimizing the design of a wind farm collection network |
Cd:240 |
OR/MS / 53 / 4 / 351 |
Carbon capture by fossil fuel power plants: An economic analysis |
Db:240 |
OR/MS / 52 / 5-6 / 495 |
Breaking the deadlock: Improving water-release policies on the Delaware River through operations research |
Dz:240 |
OR/MS / 52 / 5-6 / 505 |
A statistical analysis of multiple temperature proxies: Reconstruction of surface temperatures over the last 1000
years reliable? |
Ee:240 |
OR/MS / 52 / 5-6 / 529 |
General Electric uses an integrated framework for product costing, demand forecasting, and capacity planning of new photovoltaic technology products |
Db:240 |
OR/MS / 51 / 4 / 365 |
An integer programming approach to scheduling in a contaminated area |
Cb:240 |
OR/MS / 51 / 1-2 / 63 |
Electricity pool prices: Long-term uncertainty characterization for futures-market trading and risk management |
Ef:240 |
OR/MS / 50 / 5-6 / 567 |
A multicriteria model for risk sorting of natural gas pipelines based on ELECTRE TRI integrating utility theory |
Cb:240 |
OR/MS / 50 / 1-2 / 61 |
Development of a green building decision support tool: A collaborative process |
Ea:240 |
OR/MS / 49 / 5-6 / 487 |
Effects of E-waste regulation on new product introduction |
Fd:240 |
OR/MS / 49 / 5-6 / 533 |
Polar bear population forecasts: A public–policy forecasting audit |
Eb:240 |
OR/MS / 49 / 3 / 249 |
Effects of E-waste regulation on new product introduction |
Fd:240 |
OR/MS / 49 / 3 / 275 |
Problem structuring methods: Theorizing the benefits of deconstructing sustainable development projects |
Dz:240 |
OR/MS / 48 / 4-5 / 445 |
Environmental disasters as risk regulation catalysts? The role of Bhopal, Chernobyl, Exxon Valdez, Love Canal and Three Mile Island in shaping U.S. environmental law |
Ez:240 |
OR/MS / 48 / 4-5 / 483 |
An interval nonlinear program for the planning of waste management systems with economies-of-scale effects – A case study for the region of Hamilton, Ontario, Canada |
Cb:240 |
OR/MS / 47 / 6 / 631 |
A combinatorial heuristic approach for solving real-size machinery location and road design problems in forestry planning |
Ee:240 |
OR/MS / 47 / 6 / 669 |
Gales of creative destruction and the opportunistic incumbent: The case of electric vehicles in California |
Af:240 |
OR/MS / 47 / 2 / 137 |
Simulating stakeholder support in a policy process: An application to river management |
Bc:240 |
OR/MS / 46 / 6 / 627 |
Maximizing federal natural gas royalties |
Cc:240 |
OR/MS / 46 / 6 / 647 |
Agency problems in law enforcement: Theory and application to the US Coast Guard |
Z:240 |
OR/MS / 46 / 6 / 697 |
Application of fuzzy multiple goal programming on the selection for power plants considering site and environmental constraints |
Cb:240 |
OR/MS / 46 / 5 / 527 |
Implementing a production schedule at LKAB’s Kiruna Mine |
Cc:240 |
OR/MS / 46 / 1 / 67 |
Dynamic pricing and learning in electricity markets |
Dc:240 |
OR/MS / 45 / 6 / 665 |
Multiagent modeling and simulation of hydraulic management of the Camargue |
De:240 |
OR/MS / 45 / 5 / 549 |
Urban water management with artificial societies of agents: The FIRMABAR simulator |
De:240 |
OR/MS / 45 / 5 / 553 |
Supply chain modelling of forest fuel |
Ah:240 |
OR/MS / 45 / 2 / 131 |
Estimating regional air quality vehicle emission inventories: Constructing robust driving cycles |
Dz:240 |
OR/MS / 44 / 3 / 299 |
Environmental risk and uncertainty: Insights from Yucca Mountain |
Ef:240 |
OR/MS / 44 / 2 / 185 |
The ecology of terror defense |
Z:240 |
OR/MS / 44 / 2 / 223 |
Two alternative models for farm management: Discrete versus continuous time horizon |
Db:240 |
OR/MS / 43 / 6 / 661 |
Nature reserve site selection to maximize expected species covered |
Cb:240 |
OR/MS / 43 / 4 / 391 |
Micromotives in global environmental policy |
Bz:240 |
OR/MS / 43 / 3 / 279 |
Corporate environmentalism: The construct and its measurement |
Az:240 |
OR/MS / 43 / 2 / 137 |
Effects of neighborhood demographic shifts on findings of environmental injustice: A New York City case study |
Db:240 |
OR/MS / 43 / 2 / 183 |
Transition economies: Performance and challenges |
Ag:240 |
OR/MS / 43 / 1 / 21 |
Goal programming: Application in the management of the miombo woodland in Mozambique |
Cb:240 |
OR/MS / 42 / 4 / 413 |
Gaining from green management: Environmental management systems inside and outside the factory |
Az:240 |
OR/MS / 42 / 2 / 137 |
Schumpeter, Schumacher and the greening of technology |
Ae:240 |
OR/MS / 42 / 1 / 17 |
Performance analysis and best implementations of old and new algorithms for the open-pit mining problem |
Cz:240 |
OR/MS / 41 / 6 / 647 |
Do painless environmental policies exist? |
Ae:240 |
OR/MS / 41 / 5 / 493 |
A characterization of logistic networks for product recovery |
Cc:240 |
OR/MS / 41 / 5 / 541 |
Action bias and environmental decisions |
Ea:240 |
OR/MS / 41 / 5 / 557 |
A multiple criteria decision support system for testing integrated environmental models |
Ea:240 |
OR/MS / 41 / 5 / 561 |
Developing a theory of reverse logistics |
Ah:240 |
OR/MS / 41 / 3 / 271 |
Population, food and knowledge |
Cz:240 |
OR/MS / 41 / 3 / 293 |
Selecting scenarios for environmental disaster planning |
Ez:240 |
OR/MS / 41 / 2 / 199 |
Simplicity without reduction: Thinking upstream towards the sustainable society |
Z:240 |
OR/MS / 41 / 2 / 229 |
Complex systems analysis and environmental modeling |
Ea:240 |
OR/MS / 41 / 1 / 83 |
Exercising property rights to pollute: Do cancer risks and politics affect plant emission reductions? |
Db:240 |
OR/MS / 40 / 5 / 539 |
Planning electronic power systems under demand uncertainty with different technology lead times |
Ef:240 |
OR/MS / 40 / 5 / 553 |
A mixed integer nonlinear program for oilfield production planning |
Da:240 |
OR/MS / 40 / 4 / 415 |
Putting soft OR methods to work: The case of the business improvement project at PowerGen |
Aa:240 |
OR/MS / 40 / 3 / 241 |
Retrieving and transferring embodied data: Implications for the management of interdependence within organizations |
Cz:240 |
OR/MS / 40 / 2 / 175 |