| Rapid prototyping of real-time control laws for complex mechatronic systems: A case study |
Dz:150 |
OR/MS / 44 / 6 / 673 |
| Diagonal recurrent neural networks for a walking robot |
Fb:150 |
OR/MS / 44 / 6 / 691 |
| Group decision-making using a fuzzy linguistic approach for evaluating the flexibility in a manufacturing system |
Bc:150 |
OR/MS / 44 / 5 / 503 |
| The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure |
Ca:150 |
OR/MS / 44 / 5 / 517 |
| Assessing customer perceptions of website service quality in digital marketing environments |
Fc:150 |
OR/MS / 44 / 5 / 575 |
| Work cells with staying power: Lessons for process-complete operations |
Ac:150 |
OR/MS / 44 / 4 / 361 |
| Process flexibility in supply chains |
Ah:150 |
OR/MS / 44 / 4 / 381 |
| Demand chain management theory: Constraints and development from global aerospace supply webs |
Ah:150 |
OR/MS / 44 / 3 / 251 |
| Partial deadlock detection in automated flexible manufacturing cells |
Da:150 |
OR/MS / 44 / 3 / 279 |
| An efficient simulation scheme for testing materials in a nondestructive manner |
De:150 |
OR/MS / 44 / 3 / 289 |
| Sensemaking on the shop floor: Narratives on knowledge in organizations |
Bf:150 |
OR/MS / 44 / 2 / 153 |
| The impact of organizational structure on time-based manufacturing and plant performance |
Ag:150 |
OR/MS / 44 / 1 / 21 |
| Building contingency planning for closed-loop supply chains with product recovery |
Ah:150 |
OR/MS / 44 / 1 / 27 |
| Local manufacturing systems and global economy: Are they compatible? The case of the Italian eyewear district |
Ah:150 |
OR/MS / 44 / 1 / 29 |
| Lean manufacturing: Context, practice bundles and performance |
Dz:150 |
OR/MS / 44 / 1 / 67 |
| Business process reengineering and workflow automation: A technology transfer experience |
Fa:150 |
OR/MS / 44 / 1 / 83 |
| An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem |
Cc:150 |
OR/MS / 43 / 6 / 641 |
| Reengineering of a small assembly-to-order manufacturer: A case study |
Dz:150 |
OR/MS / 43 / 6 / 669 |
| Modeling multistage cutting stock problems |
Cb:150 |
OR/MS / 43 / 5 / 531 |
| Advanced production scheduling for batch plants in process industries |
Cc:150 |
OR/MS / 43 / 5 / 539 |
| Capacity management in decentralized networks |
Cz:150 |
OR/MS / 43 / 5 / 551 |
| Deconstructing the pioneer’s advantage: Examining vintage effects and consumer valuations of quality and variety |
Dz:150 |
OR/MS / 43 / 5 / 571 |
| Assessing the effects of operational processes and information systems on inventory performance |
Ed:150 |
OR/MS / 43 / 5 / 581 |
| Cutting and reuse: An application from automobile component manufacturing |
Cd:150 |
OR/MS / 43 / 4 / 399 |
| Shop performance implications of using cells, partial cells and remainder cells |
Cz:150 |
OR/MS / 43 / 4 / 403 |
| Campaign planning for multi-stage batch processes in the chemical industry |
Ed:150 |
OR/MS / 43 / 4 / 437 |
| Unveiling the structure of supply networks: Case studies in Honda, Acura and Daimler Chrysler |
Ah:150 |
OR/MS / 43 / 3 / 261 |
| A multi-phase mathematical programming approach for effective supply chain design |
Ah:150 |
OR/MS / 43 / 3 / 263 |
| Inventory control of service parts in the final phase |
Ed:150 |
OR/MS / 43 / 3 / 331 |
| Optimizing plant-line schedules and an application at Hidden Valley Manufacturing Company |
Ed:150 |
OR/MS / 43 / 2 / 207 |
| Assembly line scheduling with concurrent operations and parallel machines |
Cc:150 |
OR/MS / 43 / 1 / 47 |
| A genetic algorithm approach for the buffer allocation problem in unreliable production lines |
Ca:150 |
OR/MS / 42 / 6 / 633 |
| Economic production lot sizing with periodic costs and overtime |
Cz:150 |
OR/MS / 42 / 6 / 647 |
| Capacity allocation among multiple product classes in make-to-order manufacturing environments |
Cz:150 |
OR/MS / 42 / 6 / 651 |
| Too much of a good thing? Product proliferation and organizational failure |
Af:150 |
OR/MS / 42 / 5 / 495 |
| Creating and transferring knowledge for productivity improvement in factories |
Ag:150 |
OR/MS / 42 / 5 / 503 |
| An integrated inventory model for supplier and retailer with defective items |
Dd:150 |
OR/MS / 42 / 5 / 541 |
| The impact of purchasing integration and practices on manufacturing performance |
Ah:150 |
OR/MS / 42 / 4 / 377 |
| A structural equation model of new product design and development |
Ah:150 |
OR/MS / 42 / 4 / 379 |
| (Q, R, L) inventory model involving a service level constraint with defective items |
Dd:150 |
OR/MS / 42 / 4 / 421 |
| Improving the performance of time-constrained workflow processing |
Dd:150 |
OR/MS / 42 / 4 / 423 |
| Strategic planning for high-tech product development |
Ff:150 |
OR/MS / 42 / 4 / 463 |
| The rediscovery of postponement: A literature review and directions for research |
Ah:150 |
OR/MS / 42 / 3 / 255 |
| Past the tipping point: The persistence of firefighting in product development |
Bd:150 |
OR/MS / 42 / 3 / 269 |
| Capacity acquisition, subcontracting and lot sizing |
Dd:150 |
OR/MS / 42 / 3 / 305 |
| Protective capacity positioning: Impact on manufacturing cell performance |
Dd:150 |
OR/MS / 42 / 3 / 307 |
| Using cyclic planning to manage capacity at ALCOA |
Ed:150 |
OR/MS / 42 / 3 / 319 |
| Sourcing by design: Product complexity and the supply chain |
Ah:150 |
OR/MS / 42 / 2 / 133 |
| The relationship between process and manufacturing plant performance: A goal programming approach |
Cb:150 |
OR/MS / 42 / 2 / 165 |
| Production scheduling theory: Just where is it applicable? |
Cc:150 |
OR/MS / 42 / 2 / 167 |
| Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing |
Cc:150 |
OR/MS / 42 / 2 / 171 |
| Multicriteria decision making on maintenance: Spares and contracts planning |
Ea:150 |
OR/MS / 42 / 2 / 191 |
| Concurrent engineering and its consequences |
Fz:150 |
OR/MS / 42 / 2 / 227 |
| Efficient supply contracts for fashion goods with forecast updating and two production modes |
Ah:150 |
OR/MS / 42 / 1 / 29 |
| Divide and conquer: Rohm and Haas’ response to a changing specialty chemicals market |
Ah:150 |
OR/MS / 42 / 1 / 31 |
| Investigation of maintenance float problem using genetic algorithms |
Ca:150 |
OR/MS / 42 / 1 / 35 |
| Sequencing of jobs in some production system |
Cc:150 |
OR/MS / 42 / 1 / 43 |
| Workforce-constrained preventative maintenance scheduling using evolution strategies |
Cc:150 |
OR/MS / 42 / 1 / 45 |
| Scheduling with fixed delivery dates |
Cc:150 |
OR/MS / 42 / 1 / 47 |
| Separating inventory flows in the materials management department of Hancock Medical Center |
Ed:150 |
OR/MS / 42 / 1 / 71 |
| Chain or shackles: Understanding what drives supply-chain performance |
Ah:150 |
OR/MS / 41 / 6 / 617 |
| A hybrid genetic algorithm for the open shop scheduling problem |
Ca:150 |
OR/MS / 41 / 6 / 635 |
| Identifying opportunities for improving Teradyne’s service-parts logistics system |
Cc:150 |
OR/MS / 41 / 6 / 637 |
| Rightsizing and management of prototype vehicle testing at Ford Motor Company |
Cd:150 |
OR/MS / 41 / 6 / 645 |
| Threshold policies for a single-server queuing network |
Dd:150 |
OR/MS / 41 / 6 / 657 |
| Improving operations and quoting accurate lead times in a laminate plant |
Ed:150 |
OR/MS / 41 / 6 / 669 |
| An analysis of process industry production and inventory management systems |
Ed:150 |
OR/MS / 41 / 6 / 673 |
| Exploring work system practices for time-based manufacturers: Their impact on competitive capabilities |
Ac:150 |
OR/MS / 41 / 5 / 487 |
| Supply-chain synchronization: Lessons from Hyundai Motor Company |
Ah:150 |
OR/MS / 41 / 5 / 513 |
| Cooperative dispatching: Exploiting the flexibility of an FMS by means of incremental optimization |
Dd:150 |
OR/MS / 41 / 5 / 545 |
| A decision support system for business process planning |
Ea:150 |
OR/MS / 41 / 5 / 555 |
| Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains |
Ec:150 |
OR/MS / 41 / 5 / 569 |
| The surplus inventory matching problem in the process industry |
Ed:150 |
OR/MS / 41 / 5 / 571 |
| Understanding productivity: Lessons from longitudinal microdata |
Db:150 |
OR/MS / 41 / 4 / 423 |
| Fuzzy work-in-process inventory control of unreliable manufacturing systems |
Dd:150 |
OR/MS / 41 / 4 / 427 |
| Improving manufacturing performance through process change and knowledge creation |
Ag:150 |
OR/MS / 41 / 3 / 261 |
| Time-indexed formulations for machine scheduling problems: Column generation |
Cc:150 |
OR/MS / 41 / 3 / 285 |
| A load-based and due-date-oriented approach to order review/release in job shops |
Db:150 |
OR/MS / 41 / 3 / 295 |
| Manufacturing firms in developing countries: How well do they do and why? |
Ac:150 |
OR/MS / 41 / 2 / 123 |
| How the incumbent can win: Managing technological transitions in the semiconductor industry |
Af:150 |
OR/MS / 41 / 2 / 127 |