Application: 150 (Manufacturing & production planning)

Title Cat:App Page
Deux Chemicals Inc. goes just-in-time Dd:150 OR/MS / 50 / 4 / 363
Push versus pull and mass customization: A Lego inukshuk demonstration Bf:150 OR/MS / 50 / 3 / 205
The hybrid flow shop scheduling problem Cc:150 OR/MS / 50 / 3 / 221
ASP, the art and science of practice: Tales from the front: Case studies indicate the potential pitfalls of misapplication of lean improvement programs Dd:150 OR/MS / 50 / 3 / 243
Mass customization vs. mass production: Variety and price competition Cz:150 OR/MS / 50 / 1-2 / 97
Optimal production run length and warranty period setting for the imperfect production system Ed:150 OR/MS / 50 / 1-2 / 121
The determination of economic production run length and manufacturing target by considering quality loss function Ed:150 OR/MS / 50 / 1-2 / 123
A contingent view of e-collaboration and performance in manufacturing Fa:150 OR/MS / 50 / 1-2 / 129
Patterns of advanced manufacturing technology utilization and manufacturing capabilities Dz:150 OR/MS / 49 / 5-6 / 483
Quantifying costs of forecast errors: A case study of the warehouse environment Eb:150 OR/MS / 49 / 4 / 361
Production lot sizing with process deterioration and machine breakdown under inspection schedule Ed:150 OR/MS / 49 / 4 / 365
Building efficient product portfolios at John Deere and Company Af:150 OR/MS / 49 / 1-2 / 27
Application of an adaptive neural fuzzy inference system to thermal comfort and group technology problems Ec:150 OR/MS / 49 / 1-2 / 101
Spreadsheet models for inventory target setting at Procter & Gamble Ed:150 OR/MS / 49 / 1-2 / 117
MUT of a one out two system with preventive maintenance Ee:150 OR/MS / 48 / 6 / 591
Effective heuristics for the dynamic demand joint replenishment problem Cf:150 OR/MS / 48 / 4-5 / 437
Progressive interval heuristics for multi-item capacitated lot-sizing problems Ed:150 OR/MS / 48 / 4-5 / 465
Inventory routing problems: A logistical overview Ed:150 OR/MS / 48 / 4-5 / 469
Scheduling in an assembly-type production chain with batch transfer Cc:150 OR/MS / 48 / 3 / 287
A robust optimization model for production planning of perishable products Cd:150 OR/MS / 48 / 3 / 289
Strategic technology choice and capacity investment under demand uncertainty Fa:150 OR/MS / 48 / 3 / 319
Determining a common production cycle time for an economic lot scheduling problem with deteriorating items Cc:150 OR/MS / 48 / 2 / 161
Inspection and replenishment policies for systems with inventory record inaccuracy Dd:150 OR/MS / 48 / 2 / 175
An exploratory study of ‘close’ supplier-manufacturer relationships Ah:150 OR/MS / 48 / 1 / 25
Quantifying the bullwhip effect in a supply chain with stochastic lead time Ah:150 OR/MS / 48 / 1 / 29
Coordinated inventory planning for new and old products under warranty Ed:150 OR/MS / 48 / 1 / 67
Information sharing to improve retail product freshness of perishables Ah:150 OR/MS / 47 / 5 / 505
Supply chain scheduling: Distribution systems Ah:150 OR/MS / 47 / 5 / 511
Elkem uses optimization in redesigning its supply chain Ah:150 OR/MS / 47 / 5 / 513
Inventory evaluation and product slate management in large-scale continuous process industries Dd:150 OR/MS / 47 / 5 / 555
Caterpillar’s building construction products division improves and stabilizes product availability Ed:150 OR/MS / 47 / 5 / 563
Leader locations, cooperation and coordination in serial supply chains Ah:150 OR/MS / 47 / 3 / 259
Using integer programming to solve the machine scheduling problem with a flexible maintenance activity Cb:150 OR/MS / 47 / 3 / 283
a new algorithm for optimally determining lot-sizing policies for a deteriorating item in an integrated production-inventory system Dd:150 OR/MS / 47 / 3 / 309
The integral decision on production/remanufacturing technology and investment time in product recovery Dd:150 OR/MS / 47 / 3 / 311
Greedy multiprocessor server scheduling Dz:150 OR/MS / 47 / 3 / 319
Manufacturing lead time estimation using data mining Ee:150 OR/MS / 47 / 3 / 329
Balancing assembly lines with tabu search Cd:150 OR/MS / 47 / 2 / 173
A collaborative inventory system with permissible delay in payment for deteriorating items Ed:150 OR/MS / 47 / 2 / 189
Optimal dynamic assignment of a flexible worker on an open production line with specialists Dd:150 OR/MS / 47 / 1 / 69
A genetic algorithmic approach on a deterministic inventory model for deteriorating items with shortages Ca:150 OR/MS / 46 / 6 / 637
A single-machine bicriterion scheduling problem with setup times Cc:150 OR/MS / 46 / 6 / 643
Customized products: A competitive analysis Dc:150 OR/MS / 46 / 6 / 649
Less likely to fail: Low performance, firm size and factory expansion in the shipbuilding industry Ef:150 OR/MS / 46 / 6 / 659
A Petri nets-based scheduling methodology for multipurpose batch plants Cc:150 OR/MS / 46 / 5 / 531
Optimum operation control for multiple machining projects under fixed production interval Cc:150 OR/MS / 46 / 5 / 535
State-of-the-art exact and heuristic solution procedures for simple assembly line balancing Cd:150 OR/MS / 46 / 5 / 542
Economic production cycles and setup reduction in an imperfect production system Db:150 OR/MS / 46 / 5 / 549
Value at risk and inventory control Dd:150 OR/MS / 46 / 4 / 429
Performance evaluation of the remanufacturing system with consideration for remanufacturing opportunities Ed:150 OR/MS / 46 / 4 / 449
Firm performance and the strategic fit of manufacturing technology Af:150 OR/MS / 46 / 3 / 245
The shift team formation problem in multi-shift manufacturing operations Cb:150 OR/MS / 46 / 3 / 289
Single item lot sizing problems Dd:150 OR/MS / 46 / 3 / 311
Rationing via drop-shipping in internet retailing: A sensitivity analysis Fc:150 OR/MS / 46 / 3 / 335
Sizing backbone internet links Fc:150 OR/MS / 46 / 3 / 337
Reinventing the supplier negotiation process at Motorola Ah:150 OR/MS / 46 / 2 / 137
Structural flexibility: A new perspective on the design of manufacturing and service operations Ac:150 OR/MS / 46 / 1 / 17
Dynamic, customer-oriented improvement of supply networks Ah:150 OR/MS / 46 / 1 / 35
Scheduling multiple parts in two-machine dual-gripper robot cells: Heuristic algorithm and performance guarantee Cc:150 OR/MS / 46 / 1 / 61
A learning real options framework with application to process design and capacity planning Dd:150 OR/MS / 46 / 1 / 77
Analyses of serial production line systems for interdeparture time variability and WIP inventory systems Dd:150 OR/MS / 46 / 1 / 79
An overview of quality, purchasing and just-in-time interactions Ee:150 OR/MS / 46 / 1 / 91
Using stochastic goal programming: Some applications to management and a case of industrial production Cb:150 OR/MS / 45 / 6 / 647
Combining simple priority rules and controlled release with prohibited early shipments Dd:150 OR/MS / 45 / 6 / 671
PCDM: A decision support modeling methodology for supply chain, product and process design decisions Ah:150 OR/MS / 45 / 5 / 509
Towards integrated optimal configuration of platform products, manufacturing processes and supply chains Ah:150 OR/MS / 45 / 5 / 513
Heuristics for two-machine flow shop problems with earliness and tardiness penalties Cc:150 OR/MS / 45 / 4 / 397
GE Plastics optimizes the two-echelon global fulfillment network at its high performance polymers division Cd:150 OR/MS / 45 / 4 / 405
A Brownian approximation of a production-inventory system with a manufacturer that subcontracts Ed:150 OR/MS / 45 / 4 / 427
Coordinating supply chains with competition: Capacity allocation in semiconductor manufacturing Ah:150 OR/MS / 45 / 3 / 259
Solving multi-objective production scheduling problems using metaheuristics Cc:150 OR/MS / 45 / 3 / 289
A simulated annealing approach for the circular cutting problem Cf:150 OR/MS / 45 / 3 / 297
Reducing simulation models for scheduling manufacturing facilities De:150 OR/MS / 45 / 3 / 303
Failure replacement and preventative maintenance spare parts ordering policy Ed:150 OR/MS / 45 / 3 / 327
Replenishment decisions with defective items under trade credit policy Ed:150 OR/MS / 45 / 3 / 329
Using simulation to make order acceptance/rejection decisions De:150 OR/MS / 45 / 2 / 171
Two-stage imperfect production systems with inspection errors Dd:150 OR/MS / 45 / 1 / 75
Measuring dimensions of manufacturing flexibility Dz:150 OR/MS / 45 / 1 / 81
Rapid prototyping of real-time control laws for complex mechatronic systems: A case study Dz:150 OR/MS / 44 / 6 / 673
Diagonal recurrent neural networks for a walking robot Fb:150 OR/MS / 44 / 6 / 691