| Quality investment and inspection policy in a supplier-manufacturer supply chain |
Ah:150 |
OR/MS / 50 / 4 / 313 |
| A novel hybrid quantum–inspired evolutionary algorithm for permutation flow-shop scheduling |
Cc:150 |
OR/MS / 50 / 4 / 335 |
| Deux Chemicals Inc. goes just-in-time |
Dd:150 |
OR/MS / 50 / 4 / 363 |
| Push versus pull and mass customization: A Lego inukshuk demonstration |
Bf:150 |
OR/MS / 50 / 3 / 205 |
| The hybrid flow shop scheduling problem |
Cc:150 |
OR/MS / 50 / 3 / 221 |
| ASP, the art and science of practice: Tales from the front: Case studies indicate the potential pitfalls of misapplication of lean improvement programs |
Dd:150 |
OR/MS / 50 / 3 / 243 |
| Mass customization vs. mass production: Variety and price competition |
Cz:150 |
OR/MS / 50 / 1-2 / 97 |
| Optimal production run length and warranty period setting for the imperfect production system |
Ed:150 |
OR/MS / 50 / 1-2 / 121 |
| The determination of economic production run length and manufacturing target by considering quality loss function |
Ed:150 |
OR/MS / 50 / 1-2 / 123 |
| A contingent view of e-collaboration and performance in manufacturing |
Fa:150 |
OR/MS / 50 / 1-2 / 129 |
| Patterns of advanced manufacturing technology utilization and manufacturing capabilities |
Dz:150 |
OR/MS / 49 / 5-6 / 483 |
| Quantifying costs of forecast errors: A case study of the warehouse environment |
Eb:150 |
OR/MS / 49 / 4 / 361 |
| Production lot sizing with process deterioration and machine breakdown under inspection schedule |
Ed:150 |
OR/MS / 49 / 4 / 365 |
| Building efficient product portfolios at John Deere and Company |
Af:150 |
OR/MS / 49 / 1-2 / 27 |
| Application of an adaptive neural fuzzy inference system to thermal comfort and group technology problems |
Ec:150 |
OR/MS / 49 / 1-2 / 101 |
| Spreadsheet models for inventory target setting at Procter & Gamble |
Ed:150 |
OR/MS / 49 / 1-2 / 117 |
| MUT of a one out two system with preventive maintenance |
Ee:150 |
OR/MS / 48 / 6 / 591 |
| Effective heuristics for the dynamic demand joint replenishment problem |
Cf:150 |
OR/MS / 48 / 4-5 / 437 |
| Progressive interval heuristics for multi-item capacitated lot-sizing problems |
Ed:150 |
OR/MS / 48 / 4-5 / 465 |
| Inventory routing problems: A logistical overview |
Ed:150 |
OR/MS / 48 / 4-5 / 469 |
| Scheduling in an assembly-type production chain with batch transfer |
Cc:150 |
OR/MS / 48 / 3 / 287 |
| A robust optimization model for production planning of perishable products |
Cd:150 |
OR/MS / 48 / 3 / 289 |
| Strategic technology choice and capacity investment under demand uncertainty |
Fa:150 |
OR/MS / 48 / 3 / 319 |
| Determining a common production cycle time for an economic lot scheduling problem with deteriorating items |
Cc:150 |
OR/MS / 48 / 2 / 161 |
| Inspection and replenishment policies for systems with inventory record inaccuracy |
Dd:150 |
OR/MS / 48 / 2 / 175 |
| An exploratory study of ‘close’ supplier-manufacturer relationships |
Ah:150 |
OR/MS / 48 / 1 / 25 |
| Quantifying the bullwhip effect in a supply chain with stochastic lead time |
Ah:150 |
OR/MS / 48 / 1 / 29 |
| Coordinated inventory planning for new and old products under warranty |
Ed:150 |
OR/MS / 48 / 1 / 67 |
| Information sharing to improve retail product freshness of perishables |
Ah:150 |
OR/MS / 47 / 5 / 505 |
| Supply chain scheduling: Distribution systems |
Ah:150 |
OR/MS / 47 / 5 / 511 |
| Elkem uses optimization in redesigning its supply chain |
Ah:150 |
OR/MS / 47 / 5 / 513 |
| Inventory evaluation and product slate management in large-scale continuous process industries |
Dd:150 |
OR/MS / 47 / 5 / 555 |
| Caterpillar’s building construction products division improves and stabilizes product availability |
Ed:150 |
OR/MS / 47 / 5 / 563 |
| Leader locations, cooperation and coordination in serial supply chains |
Ah:150 |
OR/MS / 47 / 3 / 259 |
| Using integer programming to solve the machine scheduling problem with a flexible maintenance activity |
Cb:150 |
OR/MS / 47 / 3 / 283 |
| a new algorithm for optimally determining lot-sizing policies for a deteriorating item in an integrated production-inventory system |
Dd:150 |
OR/MS / 47 / 3 / 309 |
| The integral decision on production/remanufacturing technology and investment time in product recovery |
Dd:150 |
OR/MS / 47 / 3 / 311 |
| Greedy multiprocessor server scheduling |
Dz:150 |
OR/MS / 47 / 3 / 319 |
| Manufacturing lead time estimation using data mining |
Ee:150 |
OR/MS / 47 / 3 / 329 |
| Balancing assembly lines with tabu search |
Cd:150 |
OR/MS / 47 / 2 / 173 |
| A collaborative inventory system with permissible delay in payment for deteriorating items |
Ed:150 |
OR/MS / 47 / 2 / 189 |
| Optimal dynamic assignment of a flexible worker on an open production line with specialists |
Dd:150 |
OR/MS / 47 / 1 / 69 |
| A genetic algorithmic approach on a deterministic inventory model for deteriorating items with shortages |
Ca:150 |
OR/MS / 46 / 6 / 637 |
| A single-machine bicriterion scheduling problem with setup times |
Cc:150 |
OR/MS / 46 / 6 / 643 |
| Customized products: A competitive analysis |
Dc:150 |
OR/MS / 46 / 6 / 649 |
| Less likely to fail: Low performance, firm size and factory expansion in the shipbuilding industry |
Ef:150 |
OR/MS / 46 / 6 / 659 |
| A Petri nets-based scheduling methodology for multipurpose batch plants |
Cc:150 |
OR/MS / 46 / 5 / 531 |
| Optimum operation control for multiple machining projects under fixed production interval |
Cc:150 |
OR/MS / 46 / 5 / 535 |
| State-of-the-art exact and heuristic solution procedures for simple assembly line balancing |
Cd:150 |
OR/MS / 46 / 5 / 542 |
| Economic production cycles and setup reduction in an imperfect production system |
Db:150 |
OR/MS / 46 / 5 / 549 |
| Value at risk and inventory control |
Dd:150 |
OR/MS / 46 / 4 / 429 |
| Performance evaluation of the remanufacturing system with consideration for remanufacturing opportunities |
Ed:150 |
OR/MS / 46 / 4 / 449 |
| Firm performance and the strategic fit of manufacturing technology |
Af:150 |
OR/MS / 46 / 3 / 245 |
| The shift team formation problem in multi-shift manufacturing operations |
Cb:150 |
OR/MS / 46 / 3 / 289 |
| Single item lot sizing problems |
Dd:150 |
OR/MS / 46 / 3 / 311 |
| Rationing via drop-shipping in internet retailing: A sensitivity analysis |
Fc:150 |
OR/MS / 46 / 3 / 335 |
| Sizing backbone internet links |
Fc:150 |
OR/MS / 46 / 3 / 337 |
| Reinventing the supplier negotiation process at Motorola |
Ah:150 |
OR/MS / 46 / 2 / 137 |
| Structural flexibility: A new perspective on the design of manufacturing and service operations |
Ac:150 |
OR/MS / 46 / 1 / 17 |
| Dynamic, customer-oriented improvement of supply networks |
Ah:150 |
OR/MS / 46 / 1 / 35 |
| Scheduling multiple parts in two-machine dual-gripper robot cells: Heuristic algorithm and performance guarantee |
Cc:150 |
OR/MS / 46 / 1 / 61 |
| A learning real options framework with application to process design and capacity planning |
Dd:150 |
OR/MS / 46 / 1 / 77 |
| Analyses of serial production line systems for interdeparture time variability and WIP inventory systems |
Dd:150 |
OR/MS / 46 / 1 / 79 |
| An overview of quality, purchasing and just-in-time interactions |
Ee:150 |
OR/MS / 46 / 1 / 91 |
| Using stochastic goal programming: Some applications to management and a case of industrial production |
Cb:150 |
OR/MS / 45 / 6 / 647 |
| Combining simple priority rules and controlled release with prohibited early shipments |
Dd:150 |
OR/MS / 45 / 6 / 671 |
| PCDM: A decision support modeling methodology for supply chain, product and process design decisions |
Ah:150 |
OR/MS / 45 / 5 / 509 |
| Towards integrated optimal configuration of platform products, manufacturing processes and supply chains |
Ah:150 |
OR/MS / 45 / 5 / 513 |
| Heuristics for two-machine flow shop problems with earliness and tardiness penalties |
Cc:150 |
OR/MS / 45 / 4 / 397 |
| GE Plastics optimizes the two-echelon global fulfillment network at its high performance polymers division |
Cd:150 |
OR/MS / 45 / 4 / 405 |
| A Brownian approximation of a production-inventory system with a manufacturer that subcontracts |
Ed:150 |
OR/MS / 45 / 4 / 427 |
| Coordinating supply chains with competition: Capacity allocation in semiconductor manufacturing |
Ah:150 |
OR/MS / 45 / 3 / 259 |
| Solving multi-objective production scheduling problems using metaheuristics |
Cc:150 |
OR/MS / 45 / 3 / 289 |
| A simulated annealing approach for the circular cutting problem |
Cf:150 |
OR/MS / 45 / 3 / 297 |
| Reducing simulation models for scheduling manufacturing facilities |
De:150 |
OR/MS / 45 / 3 / 303 |
| Failure replacement and preventative maintenance spare parts ordering policy |
Ed:150 |
OR/MS / 45 / 3 / 327 |
| Replenishment decisions with defective items under trade credit policy |
Ed:150 |
OR/MS / 45 / 3 / 329 |
| Using simulation to make order acceptance/rejection decisions |
De:150 |
OR/MS / 45 / 2 / 171 |
| Two-stage imperfect production systems with inspection errors |
Dd:150 |
OR/MS / 45 / 1 / 75 |
| Measuring dimensions of manufacturing flexibility |
Dz:150 |
OR/MS / 45 / 1 / 81 |