Percent defective summary chart: Solving a real shop problem |
110:Y |
361 |
Computing the percentage points of the run-length distributions of multivariate CUSUM control charts |
111:Y |
363 |
A control chart method for ordinal data |
111:Y |
365 |
One-sided control charts for the mean of positively skewed distributions |
111:Y |
367 |
Some hypothesis tests for the covariance matrix when the dimension is large compared to the sample size |
210:Y |
369 |
Virtual inspection: Optimum sample size for POD experiment |
240:Y |
371 |
SPC monitoring of MMSE- and PI-controlled processes |
290:Y |
375 |
Simple quality for smaller organizations |
313:A |
379 |
Do quality consultants offer a quality service? |
319:Y |
383 |
The little engine that could: Self-efficacy implications for quality training outcomes |
331:T |
385 |
Team sense-making: A mental model for navigating uncharted territories |
332:Y |
387 |
Development of an integrated total quality management and performance measurement system for self-assessment: A method |
334:A |
389 |
An organizational profitability, productivity, performance (PPP) model: Going beyond TQM and BPR |
334:Y |
391 |
Reciprocity and educational evaluations by European inspectorates: Assumptions and reality checks |
349:T |
393 |
Customer relationship management: In B2C markets, often less is more |
350:Y |
397 |
Proposing a compact instrument to measure supplier-customer relationships in the context of TQM activities |
350:Y |
399 |
Impact of supply chain sensitivity to quality certification on quality management practices and performances |
351:Y |
403 |
Quality in US manufacturing industries: An empirical study |
410:M |
407 |
Factors relating to the adoption of quality management practices: An analysis for Spanish manufacturing firms |
410:M |
411 |
Employee participation systems in Spain. Past, present and future. |
410:Y |
415 |
Quality and economics: Five key issues |
440:A |
417 |
Deming and the proactive statistician |
510:Y |
421 |
Hypothesis testing about proportions in two finite populations |
512:Y |
425 |
Evaluation of measurement system with a small number of observers |
512:Y |
429 |
Bayesian measures of model complexity and fit |
519:Y |
431 |
A case study in design of experiments: Improving the manufacture of vicose fiber |
520:Y |
433 |
Statistical thinking in practice: Handling variability in experimental situations |
521:Y |
435 |
Quality criteria for qualitative inquiries in logistics |
620:A |
439 |
Sowing the seeds of quality: Quality at the source |
630:T |
441 |
Among demons and angels: Attitudes towards system evaluation for quality improvement in advanced vocational education |
630:T |
443 |
Product balancing under conditions of quality inflation, cost pressures and growth strategies |
640:A |
447 |
Quality management practices in a flexible manufacturing systems (FMS) environment |
640:M |
451 |
Relationships among quality management, IS use and organizational performance in the health care and non-health care setting |
650:B |
453 |
The impact of using flexible manufacturing systems on quality management practices |
660:M |
455 |
Service quality evaluation by service quality performance matrix |
670:S |
457 |
Job standardization and service quality: A closer look at the application of total quality management to the public sector |
670:S |
459 |
Improving customer service in the real estate industry: A property selection model using Taguchi loss functions |
690:S |
461 |
Measurement system analysis: The usual metrics can be noninformative |
710:M |
463 |
A simulation-based method for the process to allow continuous tracking of quality, cost and time |
790:M |
465 |
On exchangeable, causal and cascading failures |
820:Y |
467 |
How to estimate the parameters of a Weibull distribution |
820:Y |
469 |
The cost of errors in software development: Evidence from industry |
850:Y |
473 |