Improving the definition and quantification of quality costs |
440:Y |
QCAS / 54 / 1-2 / 63 |
Raising the bar |
440:Y |
QCAS / 54 / 1-2 / 65 |
Who is keeping score |
490:Y |
QCAS / 54 / 1-2 / 67 |
Conflict and complexity: Problem solving and logical thinking techniques could have saved NASA’s Challenger |
490:Y |
QCAS / 54 / 1-2 / 69 |
Ideas and realities: Investigating good practice in the management of transnational English language programmes for the higher education sector |
490:Y |
QCAS / 54 / 1-2 / 71 |
Quality evaluation of the Brazilian higher education system: Relevance, diversity, equity and effectiveness |
490:Y |
QCAS / 54 / 1-2 / 73 |
On estimation of variance in successive sampling |
510:Y |
QCAS / 54 / 1-2 / 75 |
The reality of residual analysis |
510:Y |
QCAS / 54 / 1-2 / 77 |
Censored Kullback-Leibler information and goodness-of-fit test with type II censored data |
511:Y |
QCAS / 54 / 1-2 / 79 |
Two probabilistic estimations in robust optimization |
512:Y |
QCAS / 54 / 1-2 / 81 |
The Dantzig selector: Statistical estimation when P is much larger than n |
512:Y |
QCAS / 54 / 1-2 / 83 |
Small sample distribution of the likelihood ration test in the random effects model |
512:Y |
QCAS / 54 / 1-2 / 85 |
Masking effect of inliers |
514:Y |
QCAS / 54 / 1-2 / 87 |
Variance estimation in complex survey sampling for generalized linear models |
515:Y |
QCAS / 54 / 1-2 / 89 |
A Bayesian procedure for assessing process performance based on expected relative loss with asymmetric tolerances |
519:Y |
QCAS / 54 / 1-2 / 93 |
Analysis of optimization experiments |
520:Y |
QCAS / 54 / 1-2 / 97 |
Bayesian inference and life testing plan for the Weibull distribution in presence of progressive censoring |
520:Y |
QCAS / 54 / 1-2 / 99 |
Covariate balance in simple stratified and clustered comparative studies |
529:Y |
QCAS / 54 / 1-2 / 101 |
Sampling bias and logistic models |
540:Y |
QCAS / 54 / 1-2 / 103 |
Testing for equal predictability of stationary ARMA processes |
544:Y |
QCAS / 54 / 1-2 / 111 |
An adjusted boxplot for skewed distributions |
552:Y |
QCAS / 54 / 1-2 / 113 |
What impacts the impact of rare events |
590:Y |
QCAS / 54 / 1-2 / 115 |
Robust performance indicators for non-completion in higher education |
680:Y |
QCAS / 54 / 1-2 / 131 |
Transaction management issues in web service-oriented electronic commerce systems: Performance evaluation |
700:Y |
QCAS / 54 / 1-2 / 133 |
System reliability and weighted lattice polynomials |
820:Y |
QCAS / 54 / 1-2 / 135 |
Bayesian estimation of shift point in Weibull distribution |
820:Y |
QCAS / 54 / 1-2 / 137 |
Multivariate statistical process control based on principal component analysis (MSPC-PCA): Some reflections and a case study in an auto body assembly process |
110:Y |
QCAS / 53 / 6 / 543 |
Modified Shewhart charts for high yield processes |
110:Y |
QCAS / 53 / 6 / 545 |
An NP control chart using double inspections |
112:Y |
QCAS / 53 / 6 / 547 |
A two-stage cumulative quantity control chart for monitoring Poisson processes |
119:Y |
QCAS / 53 / 6 / 549 |
Assessing process capability based on the lower confidence bound of Cpk for asymmetric tolerances |
120:Y |
QCAS / 53 / 6 / 551 |
Understanding behavioral sources of process variation following enterprise system deployment |
130:Y |
QCAS / 53 / 6 / 557 |
Probability based estimation theory for respondent driven sampling |
210:Y |
QCAS / 53 / 6 / 559 |
Theoretical measures of relative performance of classifiers for high dimensional data with small sample sizes |
210:Y |
QCAS / 53 / 6 / 561 |
Map Quest: Raytheon’s catalyst technique finds power in organizational networks |
314:Y |
QCAS / 53 / 6 / 563 |
An overview of the Shainin SystemTM for quality improvement |
319:Y |
QCAS / 53 / 6 / 567 |
QMS certification: Down with disillusionment |
342:Y |
QCAS / 53 / 6 / 577 |
Supplier’s involvement and success of radical new product development in new ventures |
350:Y |
QCAS / 53 / 6 / 579 |
It all ties together: CSX team’s project curtails fuel consumption, saves company millions |
430:Y |
QCAS / 53 / 6 / 583 |
Data conformance testing by digital analysis – A critical review and an approach to more appropriate testing |
510:Y |
QCAS / 53 / 6 / 585 |
An efficient sequential optimization approach based on the multivariate expected improvement criterion |
519:Y |
QCAS / 53 / 6 / 587 |
A two-stage procedure for comparing hazard rate functions |
519:Y |
QCAS / 53 / 6 / 589 |
Optimal designs for conjoint experiments |
520:Y |
QCAS / 53 / 6 / 591 |
Projection density estimation under an m-sample semiparametric model |
540:Y |
QCAS / 53 / 6 / 595 |
Split-plot experiments with unusual numbers of subplot runs |
549:Y |
QCAS / 53 / 6 / 597 |
Some simple nonparametric methods to test for perfect ranking in ranked set sampling |
551:Y |
QCAS / 53 / 6 / 599 |
Bayesian forecasting of an inhomogeneous Poisson process with applications to call center data |
670:Y |
QCAS / 53 / 6 / 603 |
Better safe than sorry: Look inward, not just overseas, to prevent product safety mishaps |
810:Y |
QCAS / 53 / 6 / 611 |
K’NEX success: Reliability in supply chain helps toymaker thrive while spate of recalls plays out |
810:Y |
QCAS / 53 / 6 / 613 |
Importance functions for RESTART simulation of highly-dependable systems |
810:Y |
QCAS / 53 / 6 / 615 |
MUT of a one out two system with preventive maintenance |
820:Y |
QCAS / 53 / 6 / 617 |
An empirical, path-oriented approach to software analysis and testing |
850:Y |
QCAS / 53 / 6 / 625 |
Software reliability prediction by soft computing techniques |
850:Y |
QCAS / 53 / 6 / 627 |
On the superiority of a variable sampling interval control chart |
110:Y |
QCAS / 53 / 4-5 / 361 |
Joint economic design of EWMA control charts for mean and variance |
113:Y |
QCAS / 53 / 4-5 / 365 |
Evaluating and improving the unit and group-runs chart |
210:Y |
QCAS / 53 / 4-5 / 367 |
A self-starting control chart for linear profiles |
210:Y |
QCAS / 53 / 4-5 / 369 |
Systematic sampling is a minimum support design |
210:Y |
QCAS / 53 / 4-5 / 371 |
FillerMean-adjusted bootstrap for two-phase sampling |
210:Y |
QCAS / 53 / 4-5 / 375 |
A characteristic function approach to the biased sampling model, with application to robust logistic regression |
210:Y |
QCAS / 53 / 4-5 / 379 |
Handling survey nonresponse in cluster sampling |
230:Y |
QCAS / 53 / 4-5 / 381 |
Struggles with survey weighting and regression modeling |
230:Y |
QCAS / 53 / 4-5 / 385 |
Constructing optimal randomized response designs with consideration for the level of privacy protection |
230:Y |
QCAS / 53 / 4-5 / 391 |
Sample size re-estimation: Nonparametric approach |
240:Y |
QCAS / 53 / 4-5 / 393 |
On an optimal controlled nearest proportional to size sampling scheme |
240:Y |
QCAS / 53 / 4-5 / 397 |
Sample size determination for achieving stability of double multivariate exponentially weighted moving average controller |
240:Y |
QCAS / 53 / 4-5 / 403 |
The effect of sample size on the extended self-organizing map network – A market segmentation application |
240:Y |
QCAS / 53 / 4-5 / 407 |
Sample size calculation for the log-rank tests for multi-arm trials with a control |
240:Y |
QCAS / 53 / 4-5 / 413 |
Improving adaptive importance sampling simulation of Markovian queueing models using non-parametric smoothing |
290:Y |
QCAS / 53 / 4-5 / 415 |
Eight steps to sustain change |
310:Y |
QCAS / 53 / 4-5 / 417 |
Achieve compliance through CI |
311:Y |
QCAS / 53 / 4-5 / 419 |
Army aviation depot does an about-face |
314:Y |
QCAS / 53 / 4-5 / 423 |
Does Six Sigma improve performance? |
314:Y |
QCAS / 53 / 4-5 / 425 |
Ranking customer requirements in QFD by factoring in their interrelationship values |
323:Y |
QCAS / 53 / 4-5 / 427 |
ASQ team says QMS and EMS standards support SOX |
342:Y |
QCAS / 53 / 4-5 / 433 |
The long-term impact of ISO 9000 certification on business performance: A longitudinal study using Turkish stock market returns |
342:Y |
QCAS / 53 / 4-5 / 435 |
The metrics of relationships: Measuring satisfaction, loyalty and profitability of relational customers |
350:Y |
QCAS / 53 / 4-5 / 439 |
RFID, privacy and the perception of risk: A strategic framework |
352:Y |
QCAS / 53 / 4-5 / 441 |
Exploratory data analysis in quality-improvement projects |
510:Y |
QCAS / 53 / 4-5 / 445 |
Confidence intervals for the scale parameter of exponential distribution based on Type II doubly censored samples |
511:Y |
QCAS / 53 / 4-5 / 449 |