| Multivariate control charts based on the James-Stein estimator |
119:Y |
QCAS / 62 / 3 / 185 |
| Fast integer-valued algorithms for optimal allocations under
constraints in stratified sampling |
210:Y |
QCAS / 62 / 3 / 187 |
| Importance sampling for option Greeks with discontinuous payoffs |
210:Y |
QCAS / 62 / 3 / 189 |
| Estimation after selection from uniform populations
with unequal sample size |
240:Y |
QCAS / 62 / 3 / 191 |
| The ubiquitous Ewens sampling formula |
290:Y |
QCAS / 62 / 3 / 193 |
| Asymptotically valid and exact permutation tests
based on two-sample U-statistics |
290:Y |
QCAS / 62 / 3 / 195 |
| Assessment of exponential methods of estimation under
nonresponse in two-occasion successive sampling |
290:Y |
QCAS / 62 / 3 / 197 |
| The rhetoric and reality of Lean: A multiple case study |
314:Y |
QCAS / 62 / 3 / 199 |
| Quality assurance in the political context:
In the midst of different expectations and conflicting goals |
319:Y |
QCAS / 62 / 3 / 203 |
| The effect of collaboration quality on collaboration performance:
Empirical evidence from manufacturing SMEs
in the Republic of Korea |
339:Y |
QCAS / 62 / 3 / 205 |
| Keep calm and prepare for ISO 9001:2015 |
342:Y |
QCAS / 62 / 3 / 207 |
| Assessing the organisational impact of external quality assurance:
Hypothesising key dimensions and mechanisms |
390:Y |
QCAS / 62 / 3 / 211 |
| Implementing the balanced scorecard:
Its effect on the job environment |
410:Y |
QCAS / 62 / 3 / 213 |
| Impact of implementation of quality management systems on
internal communications and external relations at schools |
410:Y |
QCAS / 62 / 3 / 217 |
| Application of just in time as a total quality management tool:
The case of an aluminium foundry manufacturing |
410:Y |
QCAS / 62 / 3 / 219 |
| The EPSI model as the main factor for identifying
customer satisfaction: Empirical research |
440:Y |
QCAS / 62 / 3 / 221 |
| Why organizations fail: Models and cases |
490:Y |
QCAS / 62 / 3 / 225 |
| Confidence regions and intervals
for meta-analysis model parameters |
511:Y |
QCAS / 62 / 3 / 227 |
| Estimation and inference on central mean subspace
for multivariate response data |
512:Y |
QCAS / 62 / 3 / 231 |
| Covariance matrix estimation for left-censored data |
515:Y |
QCAS / 62 / 3 / 233 |
| Understanding and addressing the
unbounded “likelihood” problem |
519:Y |
QCAS / 62 / 3 / 235 |
| Analysis of an unreplicated 22
factorial experiment
performed in a continuous process |
529:Y |
QCAS / 62 / 3 / 237 |
| Optimal designs for comparing curves |
529:Y |
QCAS / 62 / 3 / 239 |
| Mitigating bias in generalized linear mixed models:
The case for Bayesian nonparametrics |
551:Y |
QCAS / 62 / 3 / 241 |
| A nonparametric test for Granger causality in distribution with
application to financial contagion |
551:Y |
QCAS / 62 / 3 / 243 |
| Simulation-based fully Bayesian experimental design
for mixed effects models |
559:Y |
QCAS / 62 / 3 / 245 |
| Bayesian life test planning for log-location-scale
family of distributions |
820:Y |
QCAS / 62 / 3 / 263 |
| Prioritization of QFD customer requirements
based on the law of comparative judgments |
830:Y |
QCAS / 62 / 3 / 267 |
| Maintenance scheduling of geographically distributed assets
with prognostics information |
840:Y |
QCAS / 62 / 3 / 271 |
| Total productive maintenance in support processes:
An enabler for operation excellence |
840:Y |
QCAS / 62 / 3 / 273 |
| An application of the linear errors-in-variables model in
semiconductor device performance assessment |
110:Y |
QCAS / 62 / 1-2 / 17 |
| Another look at the EWMA control chart
with estimated parameters |
110:Y |
QCAS / 62 / 1-2 / 19 |
| Escaping from an attractor: Importance sampling and rest points I |
210:Y |
QCAS / 62 / 1-2 / 21 |
| Two-stage plans for estimating the inverse of a monotone function |
220:Y |
QCAS / 62 / 1-2 / 23 |
| Estimating population size using the network scale up method |
230:Y |
QCAS / 62 / 1-2 / 25 |
| On the question of effective sample size in network modeling:
An asymptotic Inquiry |
240:Y |
QCAS / 62 / 1-2 / 31 |
| An adaptive resampling test for detecting
the presence of significant predictors |
290:Y |
QCAS / 62 / 1-2 / 33 |
| Bounds on treatment effects in the presence of sample selection
and noncompliance: The wage effects of Job Corps |
290:Y |
QCAS / 62 / 1-2 / 35 |
| Subsampling bootstrap of count features of networks |
290:Y |
QCAS / 62 / 1-2 / 37 |
| Small-sample adjustments for tests of moderators and model fit
using robust variance estimation in meta-regression |
290:Y |
QCAS / 62 / 1-2 / 39 |
| A practical approach to data mining:
I have all these data; now what should I do? |
290:Y |
QCAS / 62 / 1-2 / 43 |
| The generalized multiset sampler |
290:Y |
QCAS / 62 / 1-2 / 45 |
| Why and how TQM leads to performance improvements |
311:Y |
QCAS / 62 / 1-2 / 47 |
| Integrated management systems towards sustainable
and socially responsible organisation |
313:Y |
QCAS / 62 / 1-2 / 49 |
| Virtual teams: Cultural adaptation,
communication quality and interpersonal trust |
332:Y |
QCAS / 62 / 1-2 / 55 |
| Testing for motivation to engage in improvements:
A conceptual framework and an initial empirical test |
334:Y |
QCAS / 62 / 1-2 / 57 |
| Effects of perceived organization support, employee engagement
and organization citizenship behavior on quality performance |
334:Y |
QCAS / 62 / 1-2 / 59 |
| Managing contract manufacturer quality
in the presence of performance ambiguity |
339:Y |
QCAS / 62 / 1-2 / 61 |
| Total quality management practices and performance outcomes
in Spanish service companies |
410:Y |
QCAS / 62 / 1-2 / 69 |
| TQM practices and knowledge management:
A multi-group analysis of constructs and structural invariance
between the manufacturing and service sectors |
410:Y |
QCAS / 62 / 1-2 / 71 |
| Emerging megatrends in quality engineering
and the “New5S” response |
430:Y |
QCAS / 62 / 1-2 / 73 |
| The conditional in-control performance
of self-starting control charts |
510:Y |
QCAS / 62 / 1-2 / 79 |
| Model specification and confidence intervals
for voice communication |
511:Y |
QCAS / 62 / 1-2 / 83 |
| Statistical methods for estimating
the minimum thickness along a pipeline |
519:Y |
QCAS / 62 / 1-2 / 89 |
| Randomized controlled field trials of predictive policing |
519:Y |
QCAS / 62 / 1-2 / 91 |
| Bayesian estimation of the DINA model with Gibbs sampling |
519:Y |
QCAS / 62 / 1-2 / 95 |
| Optimal design of blocked experiments in the presence
of supplementary information about the blocks |
522:Y |
QCAS / 62 / 1-2 / 99 |
| Response surface methodology using split-plot definitive screening designs |
525:Y |
QCAS / 62 / 1-2 / 101 |
| Some ideas on why factorial designs are seldom used for full-scale experiments in continuous production processes |
529:Y |
QCAS / 62 / 1-2 / 107 |
| Some counterclaims undermine themselves in observational studies |
539:Y |
QCAS / 62 / 1-2 / 109 |
| Statistical significance of clustering using soft thresholding |
539:Y |
QCAS / 62 / 1-2 / 111 |
| Case studies: Definitive screening applied to a simulation study
of the F100-229 engine repair network |
542:Y |
QCAS / 62 / 1-2 / 115 |
| Nonparametric confidence intervals for monotone functions |
551:Y |
QCAS / 62 / 1-2 / 117 |
| Quality quandaries: Increasing the first time fix rate
in a customer contact center |
640:Y |
QCAS / 62 / 1-2 / 121 |
| Research on product quality control in Chinese online shopping: Based on the uncertainty mitigating factors of product quality |
690:Y |
QCAS / 62 / 1-2 / 133 |
| Improving reliability understanding through
estimation and prediction with usage information |
810:Y |
QCAS / 62 / 1-2 / 137 |
| The constant shape parameter assumption in Weibull regression |
820:Y |
QCAS / 62 / 1-2 / 141 |
| Developing control charts in monitoring service quality
based on the number of customer complaints |
110:Y |
QCAS / 61 / 5-6 / 429 |
| Behavior of EWMA type control charts
for small smoothing parameters |
111:Y |
QCAS / 61 / 5-6 / 433 |
| Multivariate exponentially weighted moving-average
chart for monitoring Poisson observations |
111:Y |
QCAS / 61 / 5-6 / 435 |
| Attribute control charts for the Weibull distribution
under truncated life tests |
112:Y |
QCAS / 61 / 5-6 / 439 |
| Nonparametric CUSUM control charts and their use
in two-stage SPC applications |
119:Y |
QCAS / 61 / 5-6 / 441 |
| Multistate Bayesian control chart over a finite horizon |
119:Y |
QCAS / 61 / 5-6 / 445 |
| A Bayesian approach to determine test sample size requirements
for reliability demonstration retesting after product design change |
240:Y |
QCAS / 61 / 5-6 / 447 |
| Sample size determination for training cancer classifiers
from microarray and RNA-seq data |
240:Y |
QCAS / 61 / 5-6 / 449 |
| Bayesian estimation of a discrete response model
with double rules of sample selection |
290:Y |
QCAS / 61 / 5-6 / 451 |
| Performance effects of early and late Six Sigma adoptions |
314:Y |
QCAS / 61 / 5-6 / 453 |
| Implementing design for Six Sigma in large Swedish product
developing organizations – An interview study |
314:Y |
QCAS / 61 / 5-6 / 457 |
| The impact of the conceptual total quality management
model on role stressors |
319:Y |
QCAS / 61 / 5-6 / 459 |
| Quality function deployment modeling to enhance industrialized
building system adoption in housing projects |
323:Y |
QCAS / 61 / 5-6 / 463 |