Forecasting management philosophy life cycles: A comparative study to Six Sigma and TQM |
310:Y |
QCAS / 50 / 6 / 643 |
Benchmarking as a tool of strategic management |
324:Y |
QCAS / 50 / 6 / 649 |
An investigation into issues related to the latest version of ISO 9000 |
342:Y |
QCAS / 50 / 6 / 653 |
TS 16949 – Where did it come from? |
342:Y |
QCAS / 50 / 6 / 655 |
Developing a customer-focused culture in the speculative house-building industry |
359:Y |
QCAS / 50 / 6 / 657 |
The management pattern of adopting TQM in Hong Kong companies |
410:Y |
QCAS / 50 / 6 / 661 |
Quality management in the logistics industry: An examination and a ten-step approach for quality implementation |
410:Y |
QCAS / 50 / 6 / 663 |
Quality management practices in Indian service firms |
410:Y |
QCAS / 50 / 6 / 665 |
Performance measures and quality tools in Portuguese small and medium enterprises: Survey results |
430:Y |
QCAS / 50 / 6 / 667 |
A concept of optimal quality and an application |
440:Y |
QCAS / 50 / 6 / 669 |
Small-sample comparisons for goodness-of-fit statistics in one-way multinomials with composite hypotheses |
511:Y |
QCAS / 50 / 6 / 675 |
A large deviation approach to normality testing |
511:Y |
QCAS / 50 / 6 / 677 |
Inferences based on a skipped correlation coefficient |
512:Y |
QCAS / 50 / 6 / 681 |
Subsampling methods to estimate the variance of sample means based on nonstationary spatial data with varying expected values |
512:Y |
QCAS / 50 / 6 / 683 |
Dual-response surface optimization: A weighted MSE approach |
520:Y |
QCAS / 50 / 6 / 685 |
Robustness of a class of partial dialed cross designs to the unavailability of a complete block of observations |
522:Y |
QCAS / 50 / 6 / 687 |
Minimum G aberration design construction and design tables for 24 runs |
524:Y |
QCAS / 50 / 6 / 689 |
Response surface modeling and optimization in multiresponse experiments using seemingly unrelated regressions |
525:Y |
QCAS / 50 / 6 / 691 |
A methodology for selecting representative input regions for accelerated testing |
530:Y |
QCAS / 50 / 6 / 693 |
Robust generalized regression estimation |
549:Y |
QCAS / 50 / 6 / 695 |
Assessing and benchmarking maintenance performance in a manufacturing facility: A data envelopment analysis approach |
840:Y |
QCAS / 50 / 6 / 701 |
Acceptance control charts for non-normal data |
110:Y |
QCAS / 50 / 5 / 481 |
Powerful rules for the Hotelling’s ◈ control chart |
110:Y |
QCAS / 50 / 5 / 485 |
A change-point model for a shift in variance |
111:Y |
QCAS / 50 / 5 / 489 |
Determining the time of a permanent shift in the process mean of CUSUM control charts |
111:Y |
QCAS / 50 / 5 / 493 |
Two-stage short run (X̄, S) control charts |
111:Y |
QCAS / 50 / 5 / 495 |
A new bivariate control chart to monitor the multivariate process mean and variance simultaneously |
111:Y |
QCAS / 50 / 5 / 497 |
Joint monitoring of process mean and variability with a single moving average control chart |
111:Y |
QCAS / 50 / 5 / 499 |
Designing Bayesian chain sampling plan (BChSP-1) with minimum angle method |
119:Y |
QCAS / 50 / 5 / 501 |
Learning by doing: A series of hands-on projects for SPC |
120:Y |
QCAS / 50 / 5 / 503 |
Evaluation of nonnormal process capability indices using generalized lambda distribution |
120:Y |
QCAS / 50 / 5 / 505 |
An action-research based instrument for monitoring continuous quality improvement |
230:Y |
QCAS / 50 / 5 / 507 |
Application of quality control in ICR data capture: 2001 Canadian census of agriculture |
230:Y |
QCAS / 50 / 5 / 509 |
A model for evaluating organizational competencies: An application in the context of a quality management initiative |
310:Y |
QCAS / 50 / 5 / 511 |
Knowledge management and its relationship with TQM |
310:Y |
QCAS / 50 / 5 / 515 |
Usefulness of the EFQM excellence model: Theoretical explanation of the conceptual and methodological issues |
324:Y |
QCAS / 50 / 5 / 519 |
A team performance measurement model for continuous improvement |
332:Y |
QCAS / 50 / 5 / 521 |
The new ISO 9001 and the problem of ceremonial conformity: How have audit methods evolved? |
341:Y |
QCAS / 50 / 5 / 525 |
Measuring the relative efficiency of a firm’s ability to achieve organizational benefits after ISO certification |
342:Y |
QCAS / 50 / 5 / 527 |
Leadership styles supporting ISO 9000-2000 |
342:Y |
QCAS / 50 / 5 / 531 |
Reduced quality and an unlevel playing field could make consumers happier |
490:Y |
QCAS / 50 / 5 / 535 |
Contributions to two-sample statistics |
511:Y |
QCAS / 50 / 5 / 539 |
Testing Fisher, Neyman, Pearson and Bayes |
511:Y |
QCAS / 50 / 5 / 543 |
A bootstrap test of stochastic equality of two populations |
511:Y |
QCAS / 50 / 5 / 545 |
How surprising is a new record? |
514:Y |
QCAS / 50 / 5 / 547 |
Bayesian randomized clinical trials: A decision-theoretic sequential design |
523:Y |
QCAS / 50 / 5 / 549 |
Dependent SiZer: Goodness-of-fit tests for time series models |
544:Y |
QCAS / 50 / 5 / 551 |
Tables of a truncated standard normal distribution: A singly truncated case |
590:Y |
QCAS / 50 / 5 / 555 |
Total quality management, high-commitment human resource strategy and firm performance: An empirical study |
630:Y |
QCAS / 50 / 5 / 557 |
Managing quality in the e-service system: Development and application of a process model |
670:Y |
QCAS / 50 / 5 / 565 |
Metadata-driven design of integrated environments for software performance validation |
730:Y |
QCAS / 50 / 5 / 577 |
Detecting changes in field reliability using data from a complex factory screen |
820:Y |
QCAS / 50 / 5 / 579 |
The reliability and validity of Bayesian measures for hospital profiling: A Monte Carlo assessment |
820:Y |
QCAS / 50 / 5 / 581 |
Are maintenance practices for railroad tracks effective? |
840:Y |
QCAS / 50 / 5 / 585 |
Impartial evaluation in software reliability practice |
850:Y |
QCAS / 50 / 5 / 587 |
Application of neural networks for software quality prediction using object-oriented metrics |
850:Y |
QCAS / 50 / 5 / 589 |
Resource-oriented software quality classification models |
850:Y |
QCAS / 50 / 5 / 591 |
A decision model for software maintenance |
850:Y |
QCAS / 50 / 5 / 593 |
Multivariate control charts for monitoring autocorrelated processes |
111:Y |
QCAS / 50 / 4 / 361 |
Should observations be grouped for effective process monitoring? |
190:Y |
QCAS / 50 / 4 / 367 |
Identifiable sampling design for spatial process |
210:Y |
QCAS / 50 / 4 / 371 |
On power and sample size calculations for Wald tests in generalized linear models |
210:Y |
QCAS / 50 / 4 / 375 |
Size-biased sampling and discrete nonparametric Bayesian inference |
240:Y |
QCAS / 50 / 4 / 379 |
Determination of exact sample size in the Bayesian estimation of the difference of two proportions |
240:Y |
QCAS / 50 / 4 / 385 |
The effect of lot sizing rules on order variability |
240:Y |
QCAS / 50 / 4 / 387 |
Sample size determination for estimating process precision and process loss based on multiple samples with designated accuracy ratio |
240:Y |
QCAS / 50 / 4 / 391 |
There is more to quality than continuous improvement: Listening to Plato |
311:Y |
QCAS / 50 / 4 / 393 |
Weave Six Sigma into the fabric of an organization |
311:Y |
QCAS / 50 / 4 / 397 |
Managing responsibility: What can be learned from the quality movement? |
311:Y |
QCAS / 50 / 4 / 399 |
What’s wrong with Six Sigma |
319:Y |
QCAS / 50 / 4 / 403 |
Sarbanes-Oxley and ISO 9000 |
342:Y |
QCAS / 50 / 4 / 409 |
An empirical study of the benefits and cost of ISO 9001:2000 compared to ISO 9001/2/3:1994 |
342:Y |
QCAS / 50 / 4 / 413 |
Theoretical foundation of the EFQM model: The resource-based view |
349:Y |
QCAS / 50 / 4 / 415 |
The importance of building social capital |
351:Y |
QCAS / 50 / 4 / 419 |
A critique of the concept of a national qualifications framework |
390:Y |
QCAS / 50 / 4 / 421 |
The state of business process reengineering: A search for success factors |
420:Y |
QCAS / 50 / 4 / 427 |
Using quality management tools to enhance feedback from student evaluations |
430:Y |
QCAS / 50 / 4 / 429 |
A Bayesian ◈ test for goodness of fit |
511:Y |
QCAS / 50 / 4 / 431 |
Confidence intervals for two sample binomial distribution |
511:Y |
QCAS / 50 / 4 / 433 |
Foundations of probabilistic inference with uncertain evidence |
512:Y |
QCAS / 50 / 4 / 435 |