On the performance of EWMA chart in the presence of two-component measurement error |
110:Y |
185 |
Linear filter model representations for integrated process control with repeated adjustments and monitoring |
190:Y |
187 |
A visualization decision support tool for multivariate SPC diagnosis using marginal CUSUM glyphs |
190:Y |
189 |
MCMC sampling for a multilevel model with non-independent residuals within and between cluster units |
210:Y |
193 |
On the probability of improved accuracy with increased sample size |
240:Y |
195 |
The future of the quality/excellence function: A vision from the Spanish firm |
310:Y |
197 |
Research on the correlation between design for Six Sigma implementation activity levels, new product development strategies and new product development performance in Taiwan’s high-tech manufacturers |
314:Y |
201 |
Role of explicit and tacit knowledge in Six Sigma projects: An empirical examination of different project success |
314:Y |
203 |
Critical analysis of Six Sigma implementation |
314:Y |
207 |
Improving the weakest link: A TOC-based framework for small businesses |
329:Y |
211 |
The impact of human resource capabilities on internal customer satisfaction and organizational effectiveness |
332:A |
215 |
Impact of multi-source feedback on leadership competency development: A longitudinal field study |
334:Y |
219 |
Results of an empirical investigation on the anticipated improvement areas of the ISO 9001:2000 standard |
324:Y |
221 |
The effects of e-business on the performance of strategic alliances |
350:Y |
225 |
A framework for building quality into construction projects – Part II |
410:A |
227 |
Contingency relationships of firm size, TQM duration, unionization, and industry context on TQM implementation – A focus on total effects |
410:Y |
229 |
Quality management initiatives in Europe: An empirical analysis according to their structural elements |
410:Y |
231 |
The effect of corporate culture and total quality management on construction project performance in Taiwan |
430:Z |
235 |
Older theory management for sustainability – A stakeholder theory |
490:A |
239 |
Multivariate effect size estimation: Confidence interval construction via latent variable modeling |
511:Y |
241 |
Maximum likelihood estimation for social network dynamics |
512:Y |
243 |
Ranking relations using analogies in biological and information networks |
530:Y |
247 |
Approximate tolerance limits under log-location-scale regression models in the presence of censoring |
540:Y |
251 |
Nonparametric profile monitoring by mixed effects modeling |
551:Y |
253 |
Managing service quality: The managers’ orientations and their consequences – Case study evidence of current practice |
670:S |
255 |
On the alignment of the purposes and views of process models in project management |
690:Y |
257 |
The effects of nationality of origin on satisfaction: An application for the public service of social housing |
690:Y |
261 |
Circling Back |
740:Y |
265 |
An empirical test of Deming’s chain reaction model |
740:Y |
267 |
Bayesian reliability, availability, and maintainability analysis for hardware systems described through continuous time Markov chains |
820:Y |
271 |
Availability of a one-unit system supported by several spares and repair facilities |
840:Y |
273 |
Optimally maintaining a Markovian deteriorating system with limited imperfect repairs |
840:Y |
275 |
Tactical and operational planning of scheduled maintenance for per-seat, on-demand air transportation |
850:Z |
277 |
Journal Contents |
|
281 |