| Optimal row–column designs in high-throughput screening experiments |
520:Y |
QCAS / 57 / 1-2 / 101 |
| The prediction properties of classical and inverse regression for the simple linear calibration problem |
540:Y |
QCAS / 57 / 1-2 / 103 |
| Edward Simpson: Bayes at Bletchley Park |
590:Y |
QCAS / 57 / 1-2 / 105 |
| Customer service quality improvement in the public sector through the internet |
640:Y |
QCAS / 57 / 1-2 / 107 |
| A framework for quality dimensions of knowledge management systems |
650:Y |
QCAS / 57 / 1-2 / 111 |
| Augmented measurement system assessment |
710:Y |
QCAS / 57 / 1-2 / 121 |
| Reliability estimation in a Weibull lifetime distribution with zero-failure field data |
820:Y |
QCAS / 57 / 1-2 / 123 |
| Change detection in the Cox proportional hazards models from different reliability data |
820:Y |
QCAS / 57 / 1-2 / 125 |
| Reliability growth management metrics and statistical methods for discrete-use systems |
820:Y |
QCAS / 57 / 1-2 / 127 |
| DeviceNet reliability assessment using physical and data link layer parameters |
820:Y |
QCAS / 57 / 1-2 / 131 |
| On the linear degradation model with multiple failure modes |
820:Y |
QCAS / 57 / 1-2 / 135 |
| Quantifying the risk in age and block replacement policies |
840:Y |
QCAS / 57 / 1-2 / 137 |
| Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer |
840:Y |
QCAS / 57 / 1-2 / 139 |
| Altered quasi-renewal concepts for modeling renewable warranty costs with imperfect repairs |
860:Y |
QCAS / 57 / 1-2 / 141 |
| The effect of lifetime buys on warranty repair operations |
860:Y |
QCAS / 57 / 1-2 / 145 |
| An application of fuzzy random variables to control charts |
110:Y |
QCAS / 56 / 5-6 / 429 |
| Nonparametric multivariate control charts based on a linkage ranking algorithm |
119:Y |
QCAS / 56 / 5-6 / 431 |
| On the expected parts per million nonconforming levels obtained from estimated process capability indices |
130:Y |
QCAS / 56 / 5-6 / 435 |
| Variation reduction for multistage manufacturing processes: A comparison survey of statistical-process-control vs. stream- of-variation methodologies |
190:Y |
QCAS / 56 / 5-6 / 437 |
| Estimation of sample selection models with two selection mechanisms |
210:Y |
QCAS / 56 / 5-6 / 441 |
| Statistical thinking and methods in quality improvement: A look to the future |
311:Y |
QCAS / 56 / 5-6 / 443 |
| Guru guide |
311:Y |
QCAS / 56 / 5-6 / 447 |
| C-Kano model: A novel approach for discovering attractive quality elements |
319:Y |
QCAS / 56 / 5-6 / 449 |
| Proactive coaching for employee development and improved business results |
331:Y |
QCAS / 56 / 5-6 / 453 |
| Brace for impact |
341:Y |
QCAS / 56 / 5-6 / 461 |
| Squaring customer demands, brand strength, and production requirements: A case example of an integrated product and branding strategy |
359:Y |
QCAS / 56 / 5-6 / 467 |
| Total quality management (TQM) strategy and organisational characteristics: Evidence from a recent WTO member |
410:Y |
QCAS / 56 / 5-6 / 471 |
| Barriers and benefits of quality management in the construction industry: An empirical study |
410:Y |
QCAS / 56 / 5-6 / 475 |
| Mixed signals: Prevent confusion about statistical terms that have multiple meanings |
510:Y |
QCAS / 56 / 5-6 / 491 |
| Max-type rank tests, U-tests and adaptive tests for the two-sample location problem – An asymptotic power study |
511:Y |
QCAS / 56 / 5-6 / 493 |
| Simultaneous optimization of mean and standard deviation |
515:Y |
QCAS / 56 / 5-6 / 495 |
| On monitoring process variance with individual observations |
515:Y |
QCAS / 56 / 5-6 / 499 |
| Modeling the variability of rankings |
515:Y |
QCAS / 56 / 5-6 / 503 |
| The generalized-trend-diffusion modeling algorithm for small data sets in the early stages of manufacturing systems |
519:Y |
QCAS / 56 / 5-6 / 505 |
| Three-level and mixed-level orthogonal arrays for lean designs |
529:Y |
QCAS / 56 / 5-6 / 509 |
| Nonparametric tests of the Markov hypothesis in continuous-time models |
551:Y |
QCAS / 56 / 5-6 / 513 |
| Factors driving website success – The key role of Internet customisation and the influence of website design quality and Internet marketing strategy |
640:Y |
QCAS / 56 / 5-6 / 515 |
| The impact of customer relationship management through implementation of information systems |
650:Y |
QCAS / 56 / 5-6 / 519 |
| On the map: What good process mapping can do for your organization |
740:Y |
QCAS / 56 / 5-6 / 541 |
| Modelling the performance of CoP in knowledge management |
740:Y |
QCAS / 56 / 5-6 / 543 |
| Self-assessment for measuring business excellence: The MUSABE method |
790:Y |
QCAS / 56 / 5-6 / 547 |
| An approach that can quickly assess product reliability |
820:Y |
QCAS / 56 / 5-6 / 551 |
| Reliability estimation by ALT when no analytical model holds |
820:Y |
QCAS / 56 / 5-6 / 555 |
| Stress test optimization using an integrated production test and field reliability model |
820:Y |
QCAS / 56 / 5-6 / 559 |
| Finite mixture of exponential model and its applications to renewal & reliability theory |
820:Y |
QCAS / 56 / 5-6 / 563 |
| System reliability for quickest path problems under time threshold and budget |
820:Y |
QCAS / 56 / 5-6 / 565 |
| Optimal preventive maintenance policy under fuzzy Bayesian reliability assessment environments |
820:Y |
QCAS / 56 / 5-6 / 567 |
| New EWMA control charts for monitoring process dispersion |
110:Y |
QCAS / 56 / 4 / 307 |
| Properties of the exponential EWMA chart with parameter estimation |
111:Y |
QCAS / 56 / 4 / 309 |
| A multivariate control chart for simultaneously monitoring process mean and variability |
111:Y |
QCAS / 56 / 4 / 313 |
| A cumulative sum scheme for monitoring frequency and size of an event |
190:Y |
QCAS / 56 / 4 / 315 |
| Nested lattice sampling: A new sampling scheme derived by randomizing nested orthogonal arrays |
210:Y |
QCAS / 56 / 4 / 319 |
| Transformation and smoothing in sample survey data |
210:Y |
QCAS / 56 / 4 / 323 |
| Conditional and restricted Pareto sampling: Two new methods for unequal probability sampling |
210:Y |
QCAS / 56 / 4 / 325 |
| The dynamics of value generation and their dependence on an organization’s internal and external value system |
332:Y |
QCAS / 56 / 4 / 331 |
| Dispositions, organizational commitment and satisfaction: A longitudinal study of MBA graduates |
339:Y |
QCAS / 56 / 4 / 335 |
| Investigating total quality management practice’s inter-relationships in ISO 9001:2000 certified organizations |
343:Y |
QCAS / 56 / 4 / 339 |
| Three examples of accurate likelihood inference |
512:Y |
QCAS / 56 / 4 / 353 |
| Consistency of normal-distribution-based pseudo maximum likelihood estimates when data are missing at random |
512:Y |
QCAS / 56 / 4 / 355 |
| The algebraic degree of phase-type distributions |
517:Y |
QCAS / 56 / 4 / 357 |
| The first (known) statistical graph: Michael Florent van Langren and the “secret” of longitude |
552:Y |
QCAS / 56 / 4 / 359 |
| A framework for the assessment of an organization’s innovation excellence |
640:Y |
QCAS / 56 / 4 / 365 |
| Knowledge discovery and analysis in manufacturing |
660:Y |
QCAS / 56 / 4 / 369 |
| A study of the quality of police services in exercising public power in Taiwan |
670:Y |
QCAS / 56 / 4 / 381 |
| Corporate social responsibility: Implications for performance excellence |
690:Y |
QCAS / 56 / 4 / 389 |
| Optimization of component reliability in the design phase of capital goods |
810:Y |
QCAS / 56 / 4 / 397 |
| On the performance of EWMA chart in the presence of two-component measurement error |
110:Y |
QCAS / 56 / 3 / 185 |
| Linear filter model representations for integrated process control with repeated adjustments and monitoring |
190:Y |
QCAS / 56 / 3 / 187 |
| A visualization decision support tool for multivariate SPC diagnosis using marginal CUSUM glyphs |
190:Y |
QCAS / 56 / 3 / 189 |
| MCMC sampling for a multilevel model with non-independent residuals within and between cluster units |
210:Y |
QCAS / 56 / 3 / 193 |
| On the probability of improved accuracy with increased sample size |
240:Y |
QCAS / 56 / 3 / 195 |
| The future of the quality/excellence function: A vision from the Spanish firm |
310:Y |
QCAS / 56 / 3 / 197 |
| Research on the correlation between design for Six Sigma implementation activity levels, new product development strategies and new product development performance in Taiwan’s high-tech manufacturers |
314:Y |
QCAS / 56 / 3 / 201 |
| Role of explicit and tacit knowledge in Six Sigma projects: An empirical examination of different project success |
314:Y |
QCAS / 56 / 3 / 203 |
| Critical analysis of Six Sigma implementation |
314:Y |
QCAS / 56 / 3 / 207 |
| Improving the weakest link: A TOC-based framework for small businesses |
329:Y |
QCAS / 56 / 3 / 211 |
| Impact of multi-source feedback on leadership competency development: A longitudinal field study |
334:Y |
QCAS / 56 / 3 / 219 |
| Results of an empirical investigation on the anticipated improvement areas of the ISO 9001:2000 standard |
324:Y |
QCAS / 56 / 3 / 221 |
| The effects of e-business on the performance of strategic alliances |
350:Y |
QCAS / 56 / 3 / 225 |
| Contingency relationships of firm size, TQM duration, unionization, and industry context on TQM implementation – A focus on total effects |
410:Y |
QCAS / 56 / 3 / 229 |